Than you Mike!
Another week and enough done for another tour. All who are ready and interested, feel free to board the trams and get ready for the first stop in the Hangar.
Here in the Hangar we have three projects going, in the first bay here is one that went fast. This is a bagged kit of the French Spad VII that is already assembled and ready for paint:
In the next bay we started another French plane. This is a Heller kit of the French Noratlas that had been sent as a gift a decade or so ago. I recently found it in the stash and decided it was time to get started on it. Naturally the cockpit was done first:
The cargo interior was then installed along with some nose weights, and the cockpit was painted and added later:
The Fuselage was then closed up, some filling and sanding was done too:
Once that was done, the tail booms were built, followed by the wings:
All this was then built up and some filler was needed here too:
Once that was done the engines and propellers were built:
Finally, the engines were added to the booms and the two sub-assemblies were dry fit to start the basecoat of paint:
That is as far as we got on that, so moving to the next bay, we have the wings and tail of the An-225 taped up to paint the de-icing strips on the leading edges:
The tail leading edges got painted then:
That completes the tour of the Hangar. The Shipyards have been idle for a bit so now we move on to the Motor Pool.
Here in the Motor Pool, we have a number of started vehicles. In this first bay is the trailer I got that was so simple and easy to build:
Later it got the start of a base coat:
In the next bay is another fast build, the Dragon StuG that went together fast:
Later this got paint too:
While I had the grey paint out, we also brought it to the next bay to paint this rail car:
While that was all drying, we opened up another bay and started the M551 Sheridan tank from the Gulf War. It's a good variant I've wanted for awhile. The main hull was built up first, followed by the turret:
Moving on, we started a new project in this next bay. This is the British Cromwell ARV from IBG. The hull was built first:
Followed by the easy-assembly tracks:
Later the whole thing was assembled up to the photo-etch stage. I did cover the engine cooling vent, but the rest will wait till later:
I then started painting it with a basecoat:
In the last bay here, we started the German Leopard 2A8, assembling the lower hull first:
The upper hull then got all the little detail parts:
The the turret was started. Here it is about halfway done:
And that completes this latest tour of Maddog Manufacturing, please exit the trams in an orderly fashion. Thank you all for coming and comments are welcome!