Maddog Manufacturing Opening for 2026

Show off your completed work! One or two pictures and a brief explanation. Let others have a quick look at your finished masterpieces!
User avatar
Stuart
Elite Member
Posts: 11968
Joined: Sun Apr 06, 2014 1:06 pm
Location: North Wales

Re: Maddog Manufacturing Opening for 2026

Post by Stuart »

Great stuff Mark - It's great to see a couple of Eurocopters on the bench - especially the Squirrel, not a kit you see built very often.

The Enterprise will look great with two kit's worth of aircraft on it.
Stuart Templeton 'I may not be good but I'm slow...'
User avatar
BlackSheep214
Elite Member
Posts: 13516
Joined: Sun Apr 06, 2014 8:47 pm

Re: Maddog Manufacturing Opening for 2026

Post by BlackSheep214 »

Nice to see "The Big E" built up.
“Who controls the skies, controls the fate of this Earth”

Author unknown- 352nd Fighter Group, Blue-Nosed Bastards of Bodney

“Send one plane it’s a sortie; send two planes it’s a flight; send four planes it’s a test of airpower. - Richard Kohn
User avatar
Duke Maddog
Elite Member
Posts: 7689
Joined: Tue Jun 03, 2014 11:22 am
Location: Rowland Heights, CA

Re: Maddog Manufacturing Opening for 2026

Post by Duke Maddog »

Thank you guys! I apologize for the late reply. Here's my latest tour....

It's July now and Happy Birthday America and Happy Anniversary to me. It's time for another tour of Maddog Manufacturing so all aboard the trams to see what's happening now.

Our first stop is the Hangar which only had one project going this time, but it's a big one! I got started on the AN-225 transport, starting with assembling some of the wheels:

Image

Granted that's about 1/5th of the wheels this beastie has, and each wheel consists of five parts. I'll be working through these gradually as this progresses. Next I started with the main landing gear bay. The first part was easy:

Image

After that, every landing gear assembly needed to be built and installed one at a time. Each landing gear sub-assembly has 17 parts in each one and there are two types of main landing gear. Here's the first one installed into place:

Image

Later I got the rest of this first type of landing gear installed. This is still only one-third of the total landing gear assemblies:

Image

Once that was sufficiently dry, I installed two of the second type of landing gear to get them started:

Image

After that I got tired of dealing with all those tiny detail parts. So, I started on the engines, each of which had over twenty parts. I finally got all six of them finished and worked on their pylons next:

Image

After some more sanding and finagling, I got all six engines mounted on their pylons:

Image

After that I decided to start on the tail, cementing the two uprights to the horizontal part:

Image

Note the Exacto knife in the corner to show how big this monster is...

After that, the instructions call for installing all these little posts in the wings to hold the engines and wing fillets. The posts came in these little rods that had to be cut into fourths to place in each hole. After drilling out the holes in the wings, I started by gluing the posts in place; then when they were dry, I cut off the top 3/4's and glued to the next holes, then cut them down again, lather, rinse, repeat until all the holes had posts:

Image

Later, after sufficient setting time had passed, I added each engine pylon:

Image

Later the wing fillets went on and as they all dried, I started the other wing with the posts:

Image

Again, the engines and wing fillets then got glued on to this one and now both wings are completed:

Image

Later on, I applied a thin coat of Gator's grip glue to each pylon and fillet to reinforce the CA glue and to fill any small gaps that remained. That is all drying now and waiting for paint.

That completes the Hangar portion of this tour, on to the Shipyards.

The Shipyards have been busier, several keels were laid down for new projects. The first of these is a Mahan-class destroyer:

Image

Later after that was dry, the deck, hull and superstructure were painted:

Image

Now we'll be able to get the detail parts all added. Meanwhile, another ship's keel was laid, this time a Liberty class cargo ship:

Image

Then the superstructure and some detail parts were added:

Image

Later this was painted along with the destroyer:

Image

One more keel was laid, this time for the USS Olympia. I had this in the stash for awhile, it's time to get it built:

Image

The superstructure was then built and added to the hull later:

Image

Once all that was dry, the lower hull was painted red and then masked when dry so the upper works could all be painted white later:

Image

One last new project, the USS San Francisco was then laid down. I didn't get much further than this though:

Image

One of the two current projects were worked on as well. The Japanese ship JMSDF Chikugo (mislabeled Chikuma) got a coat of paint on it:

Image

More details will be added and detail painted and then decals will complete this little ship. Meanwhile, on the USS Enterprise, some touch up painting was done:

Image

While that was drying, I worked on the air wing, getting them all built and painted. The the deck-edge details and other small assemblies were added and this bird farm is ready for decals and final detail parts:

Image

That completes this tour of the Shipyards, on to the Motor Pool which also had only one more project going. This is the Russian BAL-E coastal defense system truck, designed to take out ships offshore, The chassis was built first, of course:

Image

Later the driver's cab, engine cover and command cabin were built and installed on the chassis:

Image

Next, the missile tubes were built:

Image

Once this was all assembled together, it got it's base coat of green:

Image

It won't be much longer on that one.


That completes this tour of the facilities for now. Thank you to all who stopped in and commented, they are always welcome.

We'll see you at the next tour.
The Duke
Virtuoso of Miniatures

"Do you know what the chain of command is? It's the chain I get and beat you with 'till you understand who's in ruttin' command!"
-Jayne Cobb, Firefly Episode 2 "The Train Job"

We are modelers - the same in spirit, in hunger to insanely buy newly released kits, hustlers in hiding our stash from our better halves and experts in using garbage as replacements for after-market parts.
User avatar
Medicman71
Elite Member
Posts: 11350
Joined: Mon Apr 07, 2014 9:32 am
Location: Houston, Tx

Re: Maddog Manufacturing Opening for 2026

Post by Medicman71 »

Awesome work Mark! That AN-225 is massive but really cool! :shoutout:
Mike

Sponsored by Boeing, Lockheed Martin, Northrop Grumman, Saab, BAE, and Dassault
User avatar
speedgraflex
Moderator
Posts: 11466
Joined: Fri Feb 10, 2017 11:08 pm
Contact:

Re: Maddog Manufacturing Opening for 2026

Post by speedgraflex »

It’s always a pleasure to see the variety of subjects you build appearing on your bench. Are there specific factors affecting your choice of subjects, Mark?
Make more models!
User avatar
Stuart
Elite Member
Posts: 11968
Joined: Sun Apr 06, 2014 1:06 pm
Location: North Wales

Re: Maddog Manufacturing Opening for 2026

Post by Stuart »

Superb stuff Mark :shoutout: :shoutout: :shoutout:
Stuart Templeton 'I may not be good but I'm slow...'
User avatar
Duke Maddog
Elite Member
Posts: 7689
Joined: Tue Jun 03, 2014 11:22 am
Location: Rowland Heights, CA

Re: Maddog Manufacturing Opening for 2026

Post by Duke Maddog »

Thank you Mike! My apologies for the lat reply, things have been crazy with my internet service lately, that and the cats have monopolized by keyboard space so I can't type replies!

Thank you Bruce! Sometimes there are specific factors. One is; do I have this in my collection already? Another: Have I seen anyone else build this recently? Another: I need this to complete a set/series/group. Another is the condition of the box it's in and/or whether it's a bagged kit or not. Those I tend to build since bad boxes make for missing pieces and decals. And another: How long has this been in my stash; it's time to build it.

Thank you Stuart!

It's been awhile, given all that has been happening, but now I have a chance to start another tour. I have a few continuing projects and started a few more. So with that being said, let's all board the trams and head out to the Hangar to start.


Here in the Hangar, we have the first bay holding the C-46 that I got from a friend that bought it in a thrift store. It's been languishing a bit, but now I have the new paint on it and started adding the landing gear and propellers:

Image

Some substantial pieces are missing from this, such as the main wheels, tail wheel and propeller hubs among others; so some rather extensive artistic license will probably be employed here.

Moving on to the next bay, we continued to work on the extensive and highly detailed main landing gear bay for the An-225. After massive effort, frustration and persistence, the final struts were installed:

Image

Later some additional parts were added and the roof of the landing gear bay were glued in place:

Image

That was enough for now, believe it or not, that landing gear bay is still only half built.

Moving on to the next bay, there is a new project started. It's a civilian version of the Mi-1 from Mach 2. It is a difficult kit to build to say the least. First step was the cockpit, which surprisingly had only one pilot seat and a bench in back for passengers:

Image

And yes, they molded the instrument panel in clear; why I do not know. Surprisingly, the fuselage went together well and I was thrilled that it did:

Image

Later additional detail parts were added to the fuselage, and the main rotors were built. They had such delicate connection points that it took forever to get glued right. I see many broken main rotors in the future:

Image

Cockpit painting came next before starting to close this up:

Image

Finally, the forward fuselage, also molded exclusively in clear; was installed along with tail rotor, more details and a test fit of the main rotor. The forward landing gear was still too wet so it flopped over when I tried standing this up:

Image

Moving on to the next bay, we have another helicopter. This is another shelf queen that has been languishing for awhile. Frankly, I don't even remember why. So, once I painted the interior, I started the process of working on this some more:

Image

I closed this up inside the fuselage and got ready to add more parts later once it dried sufficiently:

Image

That completes the Hangar portion of the tour, now on to the Shipyards.

Here in the shipyards, several new keels were laid and further progress was made on at least one project.

Starting in this first slip, we had the Skipjack receive her main mast and boom:

Image

Here's a more detailed shot of the deck, showing the details and wash effect applied to the parts on deck:

Image

Later this thing fell on the ground and several parts went missing, I recovered and replaced most of them but the one part that had been giving me trouble all throughout this build is still missing. I did get the smaller boat added to the davits on the rear, while the second boat had some detail touch-ups started:

Image

Also, one of the bowsprit parts went missing; I might just rig the forward sail on without it. I'm just tired of this taking space, especially with the mast on so I'm just gonna do what I can to get it over the finish line.

In the next slip, our first new project is this PT-73 from McHale's Navy. The rear bulkhead was finished up and added to the main hull, then the deck was glued down. That's as far as I got on this so far:

Image

I did get more done on this next project I started in the next slip. This is the old Lindbergh SS Clermont steamship that I got at a local shop. First I started with the main boiler:

Image

Later all the linkage was done for the main paddlewheels and one of the paddlewheels was assembled to place on this assembly:

Image

Those paddlewheels do move too, which is nice. After all, this was designed to be motorized, but I don't have the features I need to motorize it.

I decided to test fit these inside the hull which was molded as one piece:

Image

After seeing how they fit, I test fit the main deck on top to see if there were any issues there to deal with. So far, no:

Image

That completes the Shipyard portion of this tour, on to the Motor Pool:


Here in this first bay is a started railroad flatcar. I have a kit that has two of these included so I decided to get them started. This is as far as I got, in preparation for doing all the bogies:

Image

Moving on to the next bay, this Marine M46 Patton finally got the decals applied now that I found, fixed and bought them on a site that finally had some in stock:

Image

Just some additional details and weathering and that is done. Speaking of Marine tanks, in this next bay this M1A2 Abrams has been languishing for awhile now because the barrel got lost. Finally I found a metal barrel and installed it; painted the whole tank and added the upper machine guns to it:

Image

Now I just have to find the decals....

That concludes the Motor Pool portion of this tour, so on to the Garage in back where I started the Ecto-1A Ghostbusters car I got at San Diego Comicon. I've wanted this car for awhile and found it there so once I got home, I lost no time in getting it started. First was the assembly of the interior:

Image

Then I moved on to the apparently complicated equipment rig on the roof, assembling about 90% of it:

Image

I then just had to test fit everything together:

Image

How exciting! I then started painting the interior, then parts of the equipment rig and fit it all together again:

Image

After that, I had to finish the painting of the equipment rig, add more detail parts, and painted and assembled the light bars before adding them to the rig:

Image

After seeing how far I'd gotten, I painted the body of the car white, in preparation for additional assembly:

Image

While that was drying, I completed the painting of the interior so I could close this car up:

Image

I also detailed more of the equipment rig, touching up the paint and adding a few more detail parts:

Image

The bottom also needed painting so I painted it up as well:

Image

Once dry, the wheels went on:

Image

After that I returned to the body of the car, I clear coated it with gloss, added the interior glass and started adding some light bars and details:

Image


At that point I realized that this was the opportune time to add the decals. The long black and yellow decals gave me the most fits because they tended to roll up lengthwise, making it extremely difficult to lay down flat! I finally got them all on satisfactorily enough and moved on to add the rest of the decals:

Image

At that point, it was just a small matter to complete this car.


And with that, our tour ends here at Maddog Manufacturing, thank you all for coming in and remember, comments are welcome. We'll see you at the next tour!
The Duke
Virtuoso of Miniatures

"Do you know what the chain of command is? It's the chain I get and beat you with 'till you understand who's in ruttin' command!"
-Jayne Cobb, Firefly Episode 2 "The Train Job"

We are modelers - the same in spirit, in hunger to insanely buy newly released kits, hustlers in hiding our stash from our better halves and experts in using garbage as replacements for after-market parts.
User avatar
BlackSheep214
Elite Member
Posts: 13516
Joined: Sun Apr 06, 2014 8:47 pm

Re: Maddog Manufacturing Opening for 2026

Post by BlackSheep214 »

You’ve been busy, Mark! It’s good to see you back on the bench.
“Who controls the skies, controls the fate of this Earth”

Author unknown- 352nd Fighter Group, Blue-Nosed Bastards of Bodney

“Send one plane it’s a sortie; send two planes it’s a flight; send four planes it’s a test of airpower. - Richard Kohn
User avatar
Duke Maddog
Elite Member
Posts: 7689
Joined: Tue Jun 03, 2014 11:22 am
Location: Rowland Heights, CA

Re: Maddog Manufacturing Opening for 2026

Post by Duke Maddog »

Thank you Tom! It feels great getting back to the bench again.
The Duke
Virtuoso of Miniatures

"Do you know what the chain of command is? It's the chain I get and beat you with 'till you understand who's in ruttin' command!"
-Jayne Cobb, Firefly Episode 2 "The Train Job"

We are modelers - the same in spirit, in hunger to insanely buy newly released kits, hustlers in hiding our stash from our better halves and experts in using garbage as replacements for after-market parts.
User avatar
Impisi
Advanced Member
Posts: 149
Joined: Fri Jun 11, 2021 9:37 am

Re: Maddog Manufacturing Opening for 2026

Post by Impisi »

as always, your workers did a great job.
Cheers
Martin

my recent builds
Post Reply

Return to “Member's Gallery”